Froala

Palapa Ready and a Trench

Monday, December 29, 2008 6:35 PM

The image above is of the forms we poured today to hold our palapa over the shower, and the hot water solar heater/palapa over the toilet.  These are 6” paper forms, ready now for our designs.  Shea, Paolo, and I dug a trench to place a dining area over the edge of our seaside cliff. It was hard work, but we chatted and had fun.  The guys poured our first ‘eyebrow’ over a window, and Reynaldo busted a hydraulic line while trying to help us move a large rock.  Windy but good day!